SULLIVAN SITE UPDATE: Just in time for Christmas we have framing 1st and 2nd floor framing going up on Blocks B & E
as-well as Electrical, Plumbing and Block work all full steam ahead too!

With the framing up now, it’s really given the site some real scale, and also a preview of the water views from some of the rooftop 4 bedroom homes!

4 Sold with 11 remaining, here at 23-25 Sullivan Ave. 2,3 & 4 Bedroom Terrace houses available all with whiteware packages ( inc washing machine & dryer) plus heatpump. 5% Deposit only.